Dongguan Dalingshan most professional automatic door manufacturer - Dongguan automatic door gauge quotation
Time: 2020-02-13 View: 1549
Dongguan Dalingshan most professional automatic door manufacturer - Dongguan automatic door gauge quotation
Which is the professional automatic door installation in Dalingshan, Dongguan? How to install the automatic door? Before installation, the site location should be surveyed before construction. Before construction, the concealed type or external hanging type shall be adopted, and the position, size, weight, power switch, etc. of the door and the door. It is necessary to consider the bearing capacity of the crossbeam and the door frame to the door, and the technician shall draw the plan size diagram of the automatic door.
Which is the professional automatic door installation in Dalingshan, Dongguan? How to install the automatic door? After the preparation work before installation is completed, it is necessary to enter the construction site to install the automatic door equipment. Pay attention to the following five points when installing the automatic door.
1. The general automatic door company will hold a technical exchange meeting before the automatic door is installed, and the size of the automatic door is based on the automatic door plan, for example, the iron frame should be fixed, so it is necessary to find out the significance of the plan in the installation tracking.
2: The installation personnel must be careful when installing the automatic door, especially the body with glass door. Try not to let flowers or scratches on the door leaf. When stacking the door frame, please make sure to use paper or soft pad on the body of the glass door. Pay attention to handle with care and do not break the body of the door.
3: The installation personnel must wear the work permit and safety helmet, the welding personnel must have the electric welding certificate, and the welding of the iron frame must be carried out in accordance with the specification.
4: The electric tools used by the installation personnel shall meet the standards.
5: After the installation of automatic door equipment, the project leader shall check and sign for confirmation.
If it´s a new office decoration, it´s easy to communicate and coordinate with the decorator during the decoration period, but according to our company´s installation experience, usually customers know that the manual sliding door decoration can´t meet their needs, so they immediately want to modify the automatic door. This is a difficult thing. The specific installation shall be planned according to the specific site conditions. In general, double open manual sliding doors want to be converted into automatic doors. Of course, the original manual sliding door needs to be removed before installation. Nowadays, manual sliding doors are generally spring doors, so the two ground springs on the ground should also be dug out, and then filled with cement to make some ground. Generally, the surface decoration is made of stainless steel.