How to install indoor frameless automatic glass door / automatic glass door installation
Time: 2020-07-16 View: 1691
How to install indoor frameless automatic glass door / automatic glass door installation
How to install indoor frameless automatic glass doorHaifeng automatic glass door is divided into frameless automatic door and framed automatic door. There are many details to pay attention to when installing. If the installation is not professional, the service life of automatic glass door will be affected. So in the choice of time to choose a good reputation after-sales automatic door manufacturers, Haifeng automatic door manufacturers is a good choice.点击打开链接Fixed partition wall installation of frameless automatic glass door shall be carried out after other indoor construction procedures are completed. Fixed glass partition and movable glass automatic door must be arranged uniformly. According to the requirements of the design drawing, the positioning line of partition and automatic glass door is set, the position of door frame is determined, and the ground elevation and top elevation of door frame are accurately measured.The width of the limit groove at the top of the glass partition wall and door should be 2-4mm larger than the glass thickness, and the groove depth should be between 20-30mm to facilitate glue injection. The installation method can lead out two metal decorative board edge lines from the broken center line, and then install the limit slot on the top of the door frame according to the edge line. The wood backing plate in the groove is used to adjust the groove depth. Adjust by adding or reducing the substrate.Install metal faced wooden base. The installation method is to nail the square wood on the original embedded wood brick, or nail the square wood on the ground with expansion bolt, and then stick the metal decorative plate on the square wood. The aluminum alloy square tube can be fixed on the frame column with aluminum angle, or fixed on the wood brick embedded in the ground with wood screws.Install the hard door frame. The square timber of the door frame shall be nailed according to the broken center line, and then the external dimension and fixed position of the door frame column shall be determined with plywood (minus the size of decorative surface). Finally, the metal decorative surface is packaged. When packing, the facing joint should be placed in the middle of both sides of the installation glass. The joint position must be accurate and vertical.Automatic glass door installation. Use the glass suction cup (or glass suction cup machine) to firmly absorb the thick glass, and then hold the suction cup to lift the thick glass plate by 2-3 people and move it to the installation site for preparation. Positioning method: insert the upper part of the glass into the limit position on the top of the door frame, and then align the bottom of the lower bracket of the glass with the center line, and make the installation position of the door frames on both sides so as to facilitate the butt joint of the metal door frame sealed by thick glass, and it is required that the joint of the inner and outer faces can not be seen.Glass fixation. The inside and outside square wooden strips are nailed to the keel, and thick glass is sandwiched between the bottom of the keel, but a gap of about 4mm thick glass plate is left, and then the general glue is applied to the flat square wood. The decorative metal plate is placed on the square wood and two plane square wood strips.