What preparations need to be made before installing the automatic revolving door?

Time: 2023-05-10 View: 511
What preparations need to be made before installing the automatic revolving door? Today, the automatic door editor will take you to learn more!

1. Before installing the automatic revolving door, the door opening must be reserved.

2. When installing the automatic revolving door, the user needs to clarify and prepare the required power cord. Generally, it is a two phase three wire system, AC220V, with a high current of 16A. For this, the user needs to keep the center above the installation position of the automatic revolving door, and the length of the power line should not be less than 1.5m. Secondly, if the building provides fire linkage control signals, a passive closed relay signal line should be provided. The wire diameter shall be the top center of BV1.0x4 leading into the installation position of automatic revolving door, and the wire length shall also be 1.5m.

3. In order to facilitate the construction, the user must also provide an equipment storage room with an area of no less than 10 square meters to facilitate the temporary storage and installation of relevant precision parts of the automatic revolving door. In addition, the user shall prepare 220V/10A power supply for the smooth installation of revolving door. According to the requirements of the ground and the construction cycle, the ground stone should be laid 5 days before installation, with a high flatness of the ground. Marble or mosaic flooring can be made below the door opening, with a horizontal error of no more than (+/-) 1.5mm within the diameter range. Only in this way can the construction party complete the project on schedule and lay the foundation.


4. The construction unit shall cooperate with the automatic revolving door manufacturer to reserve lines, and the construction director on the project site shall coordinate the work. When the floor of the automatic revolving door installation working face needs to be installed with floor heating or other pipes, the construction unit or construction unit shall notify the automatic revolving door manufacturer in advance to install in order to avoid damage to the pipes caused by the revolving door construction. Generally speaking, the manufacturer of automatic revolving door will require Party A to reserve lines, usually including power lines, fire signal lines, direct dial telephone lines and other lines.